Fashion Plus CNC 109 F Cracked Pepper

Specifications:
A full-overlay five-piece solid wood 3" rail, with a reversed raised solid MDF veneer center panel. Mortise and Tenon construction
Full 1/2" plywood back, installed with our interlock system. Screwed to top and bottom
1/2" plywood sides. Light maple veneer interior and matching finished exterior
3/4"-thick, 1-1/2"-wide, kiln-dried solid hardwood. Frame and sides are installed with our interlocking system, which insures easy assembly and inseparable strength
Heavy-duty steel concealed adjustable hinge, with soft-close mechanism
3/4"-thick plywood; fully adjustable
4-1/2" toe kick with 3" inset on all standard base and vanity cabinets
3/4" solid wood, dovetail construction with high-quality stainless steel full-extension under-mount glide and soft-close safety feature

Fashion Plus CNC 109 F Cracked Pepper 10x10 Kitchen Starting

:
$8,499.00 $3,331.64
CNC-109-F-B12,CNC-109-F-B36,CNC-109-F-B36,CNC-109-F-SB36,CNC-109-F-W1230,CNC-109-F-W3630,CNC-109-F-W3630,CNC-109-F-W3624,CNC-109-F-TKS
Select a category below to begin adding items to your shopping cart or scroll below for a list of all available items.
Single Oven Cabinet
Single Oven Cabinet
  • Model
  • Description
  • Price
  • Quantity
Single Door Utility Cabinet
Single Door Utility Cabinet
  • Model
  • Description
  • Price
  • Quantity
Double Door Utility Cabinet
Double Door Utility Cabinet
  • Model
  • Description
  • Price
  • Quantity
Single Oven Cabinet
Single Oven Cabinet
  • Model
  • Description
  • Price
  • Quantity
Double Oven Cabinet
Double Oven Cabinet
  • Model
  • Description
  • Price
  • Quantity
per page